Development Focus
-----------------
There are a few project-specific deadlines coming up for milestone 2.
Development should be focused on meeting any of those deadlines and preparing
for the library releases that will be proposed at the milestone.
General Information
-------------------
This cycle we have stopped required milestone releases, and that has introduced
a side-effect that means we need to take other steps to ensure that downstream
packagers testing upgrades from Rocky to Stein do not have issues with the
version numbers calculated by PBR on the master branch.More details can be
found in the
mailing list post here:
http://lists.openstack.org/pipermail/openstack-dev/2018-October/135706.html
The release team has generated empty commits to cause PBR to increment its
calculated version as a fix for the situation, and we have a few of those
patches open still. Please merge them as soon as possible to support the people
who are testing upgrades.
https://review.openstack.org/#/q/status:open+branch:master+topic:sem-ver
Upcoming Deadlines & Dates
--------------------------
Stein-2 Milestone: January 10
--