[release] Release countdown for week R-2 Mar 29 - Apr 02
Herve Beraud
hberaud at redhat.com
Fri Mar 26 09:16:50 UTC 2021
Development Focus
-----------------
At this point we should have release candidates (RC1 or recent intermediary
release) for all the Wallaby deliverables. Teams should be working on any
release-critical bugs that would require another RC or intermediary release
before the final release.
Actions
-------
Early in the week, the release team will be proposing stable/wallaby branch
creation for all deliverables that have not branched yet, using the latest
available Wallaby release as the branch point. If your team is ready to go
for creating that branch, please let us know by leaving a +1 on these
patches.
If you would like to wait for another release before branching, you can -1
the patch and update it later in the week with the new release you would
like to use. By the end of the week the release team will merge those
patches though, unless an exception is granted.
Once stable/wallaby branches are created, if a release-critical bug is
detected, you will need to fix the issue in the master branch first, then
backport the fix to the stable/wallaby branch before releasing out of the
stable/wallaby branch.
After all of the cycle-with-rc projects have branched we will branch
devstack, grenade, and the requirements repos. This will effectively open
them up for Xena development, though the focus should still be on
finishing up Wallaby until the final release.
For projects with translations, watch for any translation patches coming
through and merge them quickly. A new release should be produced so that
translations are included in the final Wallaby release.
Finally, now is a good time to finalize release notes. In particular,
consider adding any relevant "prelude" content. Release notes are
targetted for the downstream consumers of your project, so it would be
great to include any useful information for those that are going to pick
up and use or deploy the Wallaby version of your project.
Upcoming Deadlines & Dates
--------------------------
Final RC deadline: 08 April, 2021 (R-1 week)
Final Wallaby release: 14 April, 2021
Xena virtual PTG: 19 - 23 April, 2021
Thank you for your attention
--
Hervé Beraud
Senior Software Engineer at Red Hat
irc: hberaud
https://github.com/4383/
https://twitter.com/4383hberaud
-----BEGIN PGP SIGNATURE-----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=ECSj
-----END PGP SIGNATURE-----
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openstack.org/pipermail/openstack-discuss/attachments/20210326/78ef6a1e/attachment.html>
More information about the openstack-discuss
mailing list