[kolla-ansible] partial upgrades / mixed releases in deployments
Erik Panter
E.Panter at mittwald.de
Thu Mar 4 16:43:38 UTC 2021
Hi,
We are currently preparing to upgrade a kolla-ansible deployed
OpenStack cluster and were wondering if it is possible to upgrade
individual services independently of each other, for example to
upgrade one service at a time to Ussuri while still using
kolla-ansible to deploy and reconfigure the Train versions of the
other services.
Our idea was that either the Ussuri release of kolla-ansible is used
to deploy Train and Ussuri services (with properly migrated
configuration), or that two different releases and configurations are
used for the two sets of services in the same deployment.
Does anyone have experience if this is practical or even possible?
Thank you in advance,
Erik
_____
Erik Panter
Systementwickler | Infrastruktur
Mittwald CM Service GmbH & Co. KG
Königsberger Straße 4-6
32339 Espelkamp
Tel.: 05772 / 293-900
Fax: 05772 / 293-333
Mobil: 0151 / 12345678
e.panter at mittwald.de
https://www.mittwald.de
Geschäftsführer: Robert Meyer, Florian Jürgens
St.Nr.: 331/5721/1033, USt-IdNr.: DE814773217, HRA 6640, AG Bad Oeynhausen
Komplementärin: Robert Meyer Verwaltungs GmbH, HRB 13260, AG Bad Oeynhausen
Informationen zur Datenverarbeitung im Rahmen unserer Geschäftstätigkeit
gemäß Art. 13-14 DSGVO sind unter www.mittwald.de/ds abrufbar.
More information about the openstack-discuss
mailing list