On 10/1/2018 8:37 AM, Ghanshyam Mann wrote: > +1 on adding multiattach on integrated job. It is always good to cover more features in integrate-gate instead of separate jobs. These tests does not take much time, it should be ok to add in tempest-full [1]. We should make only really slow test as 'slow' otherwise it should be fine to run in tempest-full. > > I thought adding tempest-slow on cinder was merged but it is not[2] > > [1]http://logs.openstack.org/80/606880/2/check/nova-multiattach/7f8681e/job-output.txt.gz#_2018-10-01_10_12_55_482653 > [2]https://review.openstack.org/#/c/591354/2 Actually it will be enabled in both tempest-full and tempest-slow, because there is also a multiattach test marked as 'slow': TestMultiAttachVolumeSwap. I'll push patches today. -- Thanks, Matt