Hey folks, As we approach milestone 1 for Queens, we need to be mindful of the open specs[0]. Please take some time to review the posted specs. Also if you need to propose a new spec, please do so as soon as possible. The goal for this cycle is to close the spec repo at milestone 2. The hope is to use the time after milestone 2 for additional stabilization and hardening so we would like to get as much merged prior to milestone 2 as possible. If you have any questions or issues with this plan, please let us know. We chatted about this a bit the last IRC meeting[1] but we can certainly review this plan as necessary. Thanks, -Alex [0] https://review.openstack.org/#/q/project:openstack/tripleo-specs+status:open [1] http://eavesdrop.openstack.org/meetings/tripleo/2017/tripleo.2017-10-10-14.00.log.html#l-315