On 2017-02-20 01:06:22 -0500 (-0500), Kevin Benton wrote: > Thanks for the pointers. > > So the plan for the projects with a lot of cross bug reports then is to > wait until a unified switch then? Right. While our spec[*] predates the cross-project goals model, the idea is that (assuming everything remains on track) we'll be proposing the coordinated switch to the community and TC as a Queens cycle goal. [*] http://specs.openstack.org/openstack-infra/infra-specs/specs/task-tracker.html -- Jeremy Stanley