[openstack-dev] [Mistral][TaskFlow] Long running actions

Joshua Harlow harlowja at yahoo-inc.com
Fri Mar 21 20:14:54 UTC 2014


Will advise soon, out sick with not so fun case of poison oak, will reply next week (hopefully) when I'm less incapacitated...

Sent from my really tiny device...

On Mar 21, 2014, at 3:24 AM, "Renat Akhmerov" <rakhmerov at mirantis.com<mailto:rakhmerov at mirantis.com>> wrote:

Valid concerns. It would be great to get Joshua involved in this discussion. If it’s possible to do in TaskFlow he could advise on how exactly.

Renat Akhmerov
@ Mirantis Inc.



On 21 Mar 2014, at 16:23, Stan Lagun <slagun at mirantis.com<mailto:slagun at mirantis.com>> wrote:

Don't forget HA issues. Mistral can be restarted at any moment and need to be able to proceed from the place it was interrupted on another instance. In theory it can be addressed by TaskFlow but I'm not sure it can be done without complete redesign of it


On Fri, Mar 21, 2014 at 8:33 AM, W Chan <m4d.coder at gmail.com<mailto:m4d.coder at gmail.com>> wrote:
Can the long running task be handled by putting the target task in the workflow in a persisted state until either an event triggers it or timeout occurs?  An event (human approval or trigger from an external system) sent to the transport will rejuvenate the task.  The timeout is configurable by the end user up to a certain time limit set by the mistral admin.

Based on the TaskFlow examples, it seems like the engine instance managing the workflow will be in memory until the flow is completed.  Unless there's other options to schedule tasks in TaskFlow, if we have too many of these workflows with long running tasks, seems like it'll become a memory issue for mistral...


On Thu, Mar 20, 2014 at 3:07 PM, Dmitri Zimine <dz at stackstorm.com<mailto:dz at stackstorm.com>> wrote:

For the 'asynchronous manner' discussion see http://tinyurl.com/n3v9lt8; I'm still not sure why u would want to make is_sync/is_async a primitive concept in a workflow system, shouldn't this be only up to the entity running the workflow to decide? Why is a task allowed to be sync/async, that has major side-effects for state-persistence, resumption (and to me is a incorrect abstraction to provide) and general workflow execution control, I'd be very careful with this (which is why I am hesitant to add it without much much more discussion).

Let's remove the confusion caused by "async". All tasks [may] run async from the engine standpoint, agreed.

"Long running tasks" - that's it.

Examples: wait_5_days, run_hadoop_job, take_human_input.
The Task doesn't do the job: it delegates to an external system. The flow execution needs to wait  (5 days passed, hadoob job finished with data x, user inputs y), and than continue with the received results.

The requirement is to survive a restart of any WF component without loosing the state of the long running operation.

Does TaskFlow already have a way to do it? Or ongoing ideas, considerations? If yes let's review. Else let's brainstorm together.

I agree,
that has major side-effects for state-persistence, resumption (and to me is a incorrect abstraction to provide) and general workflow execution control, I'd be very careful with this
But these requirement  comes from customers'  use cases: wait_5_day - lifecycle management workflow, long running external system - Murano requirements, user input - workflow for operation automations with control gate checks, provisions which require 'approval' steps, etc.

DZ>


_______________________________________________
OpenStack-dev mailing list
OpenStack-dev at lists.openstack.org<mailto:OpenStack-dev at lists.openstack.org>
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev



_______________________________________________
OpenStack-dev mailing list
OpenStack-dev at lists.openstack.org<mailto:OpenStack-dev at lists.openstack.org>
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev




--
Sincerely yours
Stanislav (Stan) Lagun
Senior Developer
Mirantis
35b/3, Vorontsovskaya St.
Moscow, Russia
Skype: stanlagun
www.mirantis.com<http://www.mirantis.com/>
slagun at mirantis.com<mailto:slagun at mirantis.com>
_______________________________________________
OpenStack-dev mailing list
OpenStack-dev at lists.openstack.org<mailto:OpenStack-dev at lists.openstack.org>
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev

_______________________________________________
OpenStack-dev mailing list
OpenStack-dev at lists.openstack.org<mailto:OpenStack-dev at lists.openstack.org>
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openstack.org/pipermail/openstack-dev/attachments/20140321/8f986e9d/attachment.html>


More information about the OpenStack-dev mailing list