[openstack-dev] Preparing for 2013.1.2 stable release.

Adam Gandelman adamg at canonical.com
Tue May 28 22:23:04 UTC 2013


Hi All-

We'll be freezing the stable/grizzly branches for core projects this
Friday May 30th in preparation for the 2013.1.2 stable release on
Thursday June 6th.  You can view the current queue of proposed patches
on gerrit [1].

Running up to 2013.1.1, we had a handful of patches applied as
post-freeze exceptions.  I'd like to request all PTLs  review current
bugs affecting Grizzly and help ensure any relevant fixes be proposed
soon and merged by end of week, or notify the stable-maint team of
anything critical that may land late.

It's worth noting Glance's stable/grizzly branch has been eerily quiet
since the G release, resulting in no 2013.1.1 release.  There is still
yet to be anything merged to Glance stable/grizzly but there are 9
pending bugs tagged grizzly-backport-potential [2].  If any of these are
critical and still warrant a backport, please propose a patch. See the
wiki [3] for details on proposing patches to stable branches, or ping me
(adam_g) on IRC if you are unsure.

Thanks,
Adam

[1] https://review.openstack.org/#/q/status:open+branch:stable/grizzly,n,z
[2] http://bit.ly/13gDSBy
[3] https://wiki.openstack.org/wiki/StableBranch



More information about the OpenStack-dev mailing list