Hi- The Icehouse release schedule has been finalized this afternoon and it looks like Icehouse will release on April 17th. With that, I think we can plan on the proposed release schedule for stable/havana: 2013.2.1 Dec 2 2013.2.2 Feb 6 2013.2.3 Apr 3 2013.2.4 TBD after Icehouse release That leaves 2 weeks between the 2013.2.3 release and Havana. This gives us a bit more room to deal with any release period craziness and should hopefully avoid the chance of a delay causing the point release to drop on the same day as Icehouse. Thoughts? I've updated the wiki [1] with these dates. We also have one more pending stable/grizzly release (2013.1.5) that we left with a TBD release date. Now that H is out, when should we release? I propose scheduling it somewhere around the release of the first stable/havana cut, either one week prior or one week after? In terms of scheduling of release duties, I think the pattern we followed last cycle worked well. There were no volunteers stepping up during the design summit to help for stable/havana, so it looks like its between Alan and myself. I propose one of us take on the first stable/havana release while the other takes care of the final stable/grizzly release. Alan, which would you like? Other notes and TODOs captured on the summit etherpad [2] Thanks, Adam [1] https://wiki.openstack.org/wiki/StableBranchRelease [2] https://etherpad.openstack.org/p/stable-havana-ideas