Hi All- We'll be freezing the stable/grizzly branches for core projects this Friday May 30th in preparation for the 2013.1.2 stable release on Thursday June 6th. You can view the current queue of proposed patches on gerrit [1]. Running up to 2013.1.1, we had a handful of patches applied as post-freeze exceptions. I'd like to request all PTLs review current bugs affecting Grizzly and help ensure any relevant fixes be proposed soon and merged by end of week, or notify the stable-maint team of anything critical that may land late. It's worth noting Glance's stable/grizzly branch has been eerily quiet since the G release, resulting in no 2013.1.1 release. There is still yet to be anything merged to Glance stable/grizzly but there are 9 pending bugs tagged grizzly-backport-potential [2]. If any of these are critical and still warrant a backport, please propose a patch. See the wiki [3] for details on proposing patches to stable branches, or ping me (adam_g) on IRC if you are unsure. Thanks, Adam [1] https://review.openstack.org/#/q/status:open+branch:stable/grizzly,n,z [2] http://bit.ly/13gDSBy [3] https://wiki.openstack.org/wiki/StableBranch