[charms] Charms libraries freeze on Friday
Hi All Just a reminder that this week is the last opportunity to get features into the libraries for the release. The libraries affected by this freeze are: - charm-helpers - charms.openstack - charms.ceph - zaza - zaza-openstack-tests We will be taking a stable cut (stable/21.04) of these libraries on Friday and doing a batch review of the charms to point to these cuts during the testing period with a final charm-helpers sync at this point. The reactive charms will have a build.lock file introduced to lock their versions of the layers, interfaces and python modules (the above libraries will be tracked by stable branch). Only bug fixes and features-by-exception will be accepted into the stable cuts of these libraries after that point. For the avoidance of doubt, we will be testing and releasing against the current latest stable of: - juju 2.8.10 - python-libjuju 2.8.6 - charm-tools 2.8.3 Many thanks Alex. -- Alex Kavanagh - Software Engineer OpenStack Engineering - Data Centre Development - Canonical Ltd
participants (1)
-
Alex Kavanagh