The Icehouse release schedule has been finalized this afternoon and
it looks like Icehouse will release on April 17th. With that, I
think we can plan on the proposed release schedule for
stable/havana:<br>
<br>
2013.2.1 Dec 2<br>
2013.2.2 Feb 6<br>
2013.2.3 Apr 3<br>
2013.2.4 TBD after Icehouse release<br>
<br>
That leaves 2 weeks between the 2013.2.3 release and Havana. This
gives us a bit more room to deal with any release period craziness
and should hopefully avoid the chance of a delay causing the point
release to drop on the same day as Icehouse. Thoughts? I've
updated the wiki [1] with these dates.<br>
<br>
We also have one more pending stable/grizzly release (2013.1.5) that
we left with a TBD release date. Now that H is out, when should we
release? I propose scheduling it somewhere around the release of
the first stable/havana cut, either one week prior or one week
after?<br>
<br>
In terms of scheduling of release duties, I think the pattern we
followed last cycle worked well. There were no volunteers stepping
up during the design summit to help for stable/havana, so it looks
like its between Alan and myself. I propose one of us take on the
first stable/havana release while the other takes care of the final
stable/grizzly release. Alan, which would you like?<br>
<br>
Other notes and TODOs captured on the summit etherpad [2]<br>
<br>
Thanks,<br>
Adam<br>
<br>
[1]
<meta http-equiv="content-type" content="text/html;
charset=ISO-8859-1">
<a href="https://wiki.openstack.org/wiki/StableBranchRelease">https://wiki.openstack.org/wiki/StableBranchRelease</a><br>
[2]
<meta http-equiv="content-type" content="text/html;
charset=ISO-8859-1">
<a href="https://etherpad.openstack.org/p/stable-havana-ideas">https://etherpad.openstack.org/p/stable-havana-ideas</a>
</body>
</html>