<div dir="ltr">Several of the core service packages skipped RC1 and went from milestone 3 to RC2. I generally avoid mixing packages with a difference of more than one milestone/RC version... especially milestones given significant changes to the services.<div><br></div><div>P.S. - Does anyone from RH work on the installation guide these days?</div></div><div class="gmail_extra"><br><div class="gmail_quote">On Tue, Oct 28, 2014 at 7:28 PM, Steve Gordon <span dir="ltr"><<a href="mailto:sgordon@redhat.com" target="_blank">sgordon@redhat.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div class="HOEnZb"><div class="h5">----- Original Message -----<br>
> From: "Steve Gordon" <<a href="mailto:sgordon@redhat.com">sgordon@redhat.com</a>><br>
> To: "Matt Kassawara" <<a href="mailto:mkassawara@gmail.com">mkassawara@gmail.com</a>><br>
><br>
> ----- Original Message -----<br>
> > From: "Matt Kassawara" <<a href="mailto:mkassawara@gmail.com">mkassawara@gmail.com</a>><br>
> > To: "Steve Gordon" <<a href="mailto:sgordon@redhat.com">sgordon@redhat.com</a>><br>
> ><br>
> > While OpenStack RC code often sufficiently tests services, packaging<br>
> > concerns such as dependencies and default configuration options tend to lag<br>
> > by one or more milestone/RC cycles. The RDO repository only contained<br>
> > milestone 3 packages until just prior to the official release of Juno when<br>
> > RC2 packages appeared in it.<br>
><br>
> RC2 tarballs themselves only became available just prior to the official<br>
> release (e.g. Oct 9th for Cinder, Oct 10th for Neutron) and were put into<br>
> the repo on the 13th. The gap between RC1 tarballs being available and being<br>
> put in the repo was similar.<br>
><br>
> > Testing packages (even just the core services), writing patches, reviewing<br>
> > patches, and general time allocation<br>
> > issues can delay a functional installation guide by a week or more beyond<br>
> > the package release date. Furthermore, the RDO packages require testing on<br>
> > RHEL/CentOS and Fedora plus the neutron and nova-network variations. I<br>
> > would like to provide users with a mostly functional installation guide on<br>
> > the official release date which would require availability of at least RC<br>
> > packages at least one week prior to the official release date.<br>
> > release packages becoming available yesterday afternoon and the plan to cut<br>
> > juno/stable for openstack-manuals tomorrow gives us about one day to<br>
> > install the packages on two distributions each with two variants, determine<br>
> > the issues, write patches, test them, and run them through the review<br>
> > process before all changes involve backports.<br>
><br>
> As a result of user feedback from previous test days we stage and test the<br>
> RDO packages to ensure basic sanity before putting them into the repo, this<br>
> takes time but ensures that we have at least some level of confidence in the<br>
> packages being deployed and avoids user frustration caused by basic issues<br>
> that can be easily prevented. If you wish to access the staged packages in<br>
> future while they are still undergoing testing, just ask (they are public,<br>
> just not in the main repo).<br>
<br>
</div></div>Going back through the repo [1] we pushed builds based on the final release into the repo on the 22nd/23rd and held off formally announcing while we fixed a few more bugs over the weekend.<br>
<br>
Thanks,<br>
<br>
Steve<br>
<br>
[1] <a href="https://repos.fedorapeople.org/repos/openstack/openstack-juno/epel-7/?C=M;O=A" target="_blank">https://repos.fedorapeople.org/repos/openstack/openstack-juno/epel-7/?C=M;O=A</a><br>
<div class="HOEnZb"><div class="h5">> > On Tue, Oct 28, 2014 at 4:23 PM, Steve Gordon <<a href="mailto:sgordon@redhat.com">sgordon@redhat.com</a>> wrote:<br>
> ><br>
> > > ----- Original Message -----<br>
> > > > From: "Matt Kassawara" <<a href="mailto:mkassawara@gmail.com">mkassawara@gmail.com</a>><br>
> > > > To: "Anne Gentle" <<a href="mailto:anne@openstack.org">anne@openstack.org</a>><br>
> > > ><br>
> > > > If other reasons (outside of the installation guide) exist to move it<br>
> > > > on<br>
> > > > the 29th rather than wait until after the summit, I can deal... but<br>
> > > > backporting patches for RHEL/CentOS/Fedora will take more time and<br>
> > > effort.<br>
> > > > Not our fault RDO can't push release packages out in a reasonable<br>
> > > > amount<br>
> > > of<br>
> > > > time.<br>
> > ><br>
> > > Can you elaborate on what's reasonable so we can endeavour to accommodate<br>
> > > in future? Our aim this time around was for +2 weeks on upstream release<br>
> > > to<br>
> > > allow some level of smoke testing to occur, despite that M-3 and RC<br>
> > > packages that could have been used were available leading up to this.<br>
> > ><br>
> > > We've been communicating this to users @<br>
> > > <a href="https://www.redhat.com/archives/rdo-list/" target="_blank">https://www.redhat.com/archives/rdo-list/</a><br>
> > ><br>
> > > Thanks,<br>
> > ><br>
> > > Steve<br>
> > ><br>
> > > > On Mon, Oct 27, 2014 at 9:45 PM, Anne Gentle <<a href="mailto:anne@openstack.org">anne@openstack.org</a>><br>
> > > > wrote:<br>
> > > ><br>
> > > > ><br>
> > > > > On Mon, Oct 27, 2014 at 9:34 PM, Matt Kassawara<br>
> > > > > <<a href="mailto:mkassawara@gmail.com">mkassawara@gmail.com</a>><br>
> > > > > wrote:<br>
> > > > ><br>
> > > > >> The RDO Juno release packages for RHEL/CentOS/Fedora only became<br>
> > > > >> available today [1] which leaves very little time for testing and<br>
> > > patching<br>
> > > > >> the installation guide prior to cutting juno/stable for<br>
> > > openstack-manuals<br>
> > > > >> on the 29th. Can we push it out a day or two?<br>
> > > > >><br>
> > > > ><br>
> > > > > I think if we don't do the 29th it'll be after Nov 7th due to<br>
> > > > > Andreas's<br>
> > > > > and my travel schedules, is that an okay solution?<br>
> > > > ><br>
> > > > ><br>
> > > > >><br>
> > > > >> [1]<br>
> > > > >><br>
> > > <a href="https://openstack.redhat.com/forum/discussion/992/rdo-juno-packages-available" target="_blank">https://openstack.redhat.com/forum/discussion/992/rdo-juno-packages-available</a><br>
> > > > >><br>
> > > > >> _______________________________________________<br>
> > > > >> OpenStack-docs mailing list<br>
> > > > >> <a href="mailto:OpenStack-docs@lists.openstack.org">OpenStack-docs@lists.openstack.org</a><br>
> > > > >> <a href="http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs" target="_blank">http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs</a><br>
> > > > >><br>
> > > > >><br>
> > > > ><br>
> > > ><br>
> > > > _______________________________________________<br>
> > > > OpenStack-docs mailing list<br>
> > > > <a href="mailto:OpenStack-docs@lists.openstack.org">OpenStack-docs@lists.openstack.org</a><br>
> > > > <a href="http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs" target="_blank">http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs</a><br>
> > > ><br>
> > ><br>
> > > --<br>
> > > Steve Gordon, RHCE<br>
> > > Sr. Technical Product Manager,<br>
> > > Red Hat Enterprise Linux OpenStack Platform<br>
> > ><br>
> ><br>
><br>
> _______________________________________________<br>
> OpenStack-docs mailing list<br>
> <a href="mailto:OpenStack-docs@lists.openstack.org">OpenStack-docs@lists.openstack.org</a><br>
> <a href="http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs" target="_blank">http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-docs</a><br>
><br>
<br>
--<br>
Steve Gordon, RHCE<br>
Sr. Technical Product Manager,<br>
Red Hat Enterprise Linux OpenStack Platform<br>
</div></div></blockquote></div><br></div>