<div dir="ltr"><div>Hi All</div><div><br></div><div>Just a reminder that this week is
the last opportunity to get features into the libraries for the
release. The libraries affected by this freeze are:</div><div><br></div><ul><li>charm-helpers</li><li>charms.openstack</li><li>charms.ceph</li><li>zaza</li><li>zaza-openstack-tests<br></li></ul><div>We
will be taking a stable cut (stable/21.04) of these libraries on Friday
and doing a batch review of the charms to point to these cuts during
the testing period with a final charm-helpers sync at this point. The
reactive charms will have a build.lock file introduced to lock their
versions of the layers, interfaces and python modules (the above
libraries will be tracked by stable branch).<br></div><div><br></div><div>Only bug fixes and features-by-exception will be accepted into the stable cuts of these libraries after that point.</div><div><br></div><div>For the avoidance of doubt, we will be testing and releasing against the current latest stable of:</div><div><ul><li>juju 2.8.10<br></li><li>python-libjuju 2.8.6</li><li>charm-tools 2.8.3<br></li></ul></div><div>Many thanks</div><font color="#888888"><div>Alex.</div></font><br clear="all"><br>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr">Alex Kavanagh - Software Engineer<div><span style="font-size:small">OpenStack Engineering - Data Centre Development - Canonical Ltd</span><br></div></div></div></div></div></div>