<div dir="ltr">On Sun, Feb 19, 2017 at 8:54 PM, Doug Hellmann <span dir="ltr"><<a href="mailto:doug@doughellmann.com" target="_blank">doug@doughellmann.com</a>></span> wrote:<br><div class="gmail_extra"><div class="gmail_quote"><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Release liaisons and PTLs,<br>
<br>
The patch to tag the Ocata final releases for milestone-based<br>
projects is up at [1]. Please check the patch to verify that it<br>
matches your expectations and then sign off with a +1.<br>
<br>
Thanks,<br>
Doug<br>
<br>
[1] <a href="https://review.openstack.org/#/c/435816/1" rel="noreferrer" target="_blank">https://review.openstack.org/#<wbr>/c/435816/1</a></blockquote><div><br></div><div>I see this is only for milestone-based projects. Should cycle-with-intermediary<br></div><div>projects like ironic add a diff-start to the most recent release, so the release<br></div><div>announcement has the right details?<br><br></div><div>// jim<br></div></div></div></div>