<html><body>
<p><font size="2" face="sans-serif">Hi, Keystone guys,</font><br>
<br>
<font size="2" face="sans-serif">Could we have a talk about DB2 CI enablement on this Monday, 8PM central US time? which is Tuesday 9AM beijeing time?</font><br>
<br>
<font size="2" face="sans-serif">For your questions, here are my answers:</font><br>
<br>
<font size="2" face="sans-serif">1) Is the team going to be responsive to requests unlike last time there was a problem?</font><br>
<font size="2" color="#00C200" face="sans-serif"><b>(yanfengxi) Yes, problems will be handled in time. In our current working process, issues items will be opened internally automatically if the CI fails. And our mainterner will try to handle the issues opened as soon as possible. If there are others issues, please send email to "yanfengxi@cn.ibm.com", </b></font><font size="3" color="#00C200" face="serif"><b>or reach irc account "yanfengxi" on channel #openstack-infra.</b></font><br>
<br>
<font size="2" face="sans-serif">2) Is the job stable? I have no data about the stability I couldn't vouch for it.</font><br>
<font size="2" color="#00C200" face="sans-serif"><b>(yanfengxi) From the statictics of other running CIs, we have a 88%, including environment failures, and tempest failures. Which I think is acceptable.</b></font><br>
<font size="2" color="#00C200" face="sans-serif"><b>Because keystone CI is not enabled, we do not have the statistics for it. But from several test runnings, keystone CI can run properly.</b></font><font size="2" face="sans-serif"><br>
</font><br>
<font size="2" face="sans-serif">By the way, I already updated the wiki page: </font><a href="https://wiki.openstack.org/w/index.php?title=IBM/IBM_DB2_CI"><font size="2" face="sans-serif">https://wiki.openstack.org/w/index.php?title=IBM/IBM_DB2_CI</font></a><font size="2" face="sans-serif"> to include a irc nick name.</font><br>
<font size="2" face="sans-serif"><br>
Best Regard:)<br>
Bruce Yan<br>
<br>
Yan£¬ Fengxi £¨ãÆ·ïϲ£©<br>
Openstack Platform Team<br>
IBM China Systems & Technology Lab, Beijing<br>
E-Mail: yanfengxi@cn.ibm.com<br>
Tel: 86-10-82451418  Notes: Feng Xi FX Yan/China/IBM<br>
Address: 3BW239, Ring Building. No.28 Building, ZhongGuanCun Software Park,No.8  <br>
DongBeiWang West Road, ShangDi, Haidian District, Beijing, P.R.China</font><br>
<br>
<img width="16" height="16" src="cid:1__=C7BBF4F6DFA6ED228f9e8a93df938@cn.ibm.com" border="0" alt="Inactive hide details for Brant L Knudson---2015/06/10 02:51:14---I brought this up at the keystone meeting and the community d"><font size="2" color="#424282" face="sans-serif">Brant L Knudson---2015/06/10 02:51:14---I brought this up at the keystone meeting and the community didn't want DB2 CI reporting was answere</font><br>
<br>
<font size="1" color="#5F5F5F" face="sans-serif">From:      </font><font size="1" face="sans-serif">Brant L Knudson/Rochester/IBM@IBMUS</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">To:        </font><font size="1" face="sans-serif">Feng Xi BJ Yan/China/IBM@IBMCN@IBMAU</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Cc:        </font><font size="1" face="sans-serif">Dan Moravec/Rochester/IBM@IBMUS, Zhu ZZ Zhu/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Date:      </font><font size="1" face="sans-serif">2015/06/10 02:51</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Subject:   </font><font size="1" face="sans-serif">Re: Could you help to talk about DB2 CI enablement on keystone meeting</font><br>
<hr width="100%" size="2" align="left" noshade style="color:#8091A5; "><br>
<br>
<br>
<font size="2" face="sans-serif">I brought this up at the keystone meeting and the community didn't want DB2 CI reporting was answered until a couple of questions were answered:</font><br>
<br>
<font size="2" face="sans-serif">They asked a couple of questions that I wasn't able to answer:</font><br>
<br>
<font size="2" face="sans-serif">1) Is the team going to be responsive to requests unlike last time there was a problem?</font><br>
<font size="2" face="sans-serif">2) Is the job stable? I have no data about the stability I couldn't vouch for it.</font><br>
<br>
<font size="2" face="sans-serif">They also wanted an irc nick fors someone that can answer questions and respond to problems, on the wiki page: </font><a href="https://wiki.openstack.org/w/index.php?title=IBM/IBM_DB2_CI"><font size="2" face="sans-serif">https://wiki.openstack.org/w/index.php?title=IBM/IBM_DB2_CI</font></a><br>
<br>
<font size="2" face="sans-serif">Rather than go back and forth on this week to week, they suggested that we have a meeting on freenode irc in #openstack-keystone when it's convenient enough for all of us. They were willing to meet any day at 8 PM central US time, which I think is 9 AM Beijing time. So just pick a date when you can meet and send a note to the openstack-dev mailing list when it is.</font><br>
<br>
<font size="2" face="sans-serif">Also, you can include in the note any backup material that you have, such as answers to the above questions.</font><br>
<font size="2" face="sans-serif"><br>
Brant Knudson, OpenStack Development - Keystone core member<br>
Phone:   507-253-8621 T/L:553-8621<br>
</font><br>
<br>
<br>
<img width="16" height="16" src="cid:1__=C7BBF4F6DFA6ED228f9e8a93df938@cn.ibm.com" border="0" alt="Inactive hide details for Brant L Knudson---06/03/2015 09:17:07 AM---Looks OK to me. I'll add it to the agenda for next week.  "><font size="2" color="#424282" face="sans-serif">Brant L Knudson---06/03/2015 09:17:07 AM---Looks OK to me. I'll add it to the agenda for next week.  Brant Knudson, OpenStack Development - Key</font><br>
<br>
<font size="1" color="#5F5F5F" face="sans-serif">From:      </font><font size="1" face="sans-serif">Brant L Knudson/Rochester/IBM</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">To:        </font><font size="1" face="sans-serif">Feng Xi BJ Yan/China/IBM@IBMCN@IBMAU</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Cc:        </font><font size="1" face="sans-serif">Dan Moravec/Rochester/IBM@IBMUS, Zhu ZZ Zhu/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Date:      </font><font size="1" face="sans-serif">06/03/2015 09:17 AM</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Subject:   </font><font size="1" face="sans-serif">Re: Could you help to talk about DB2 CI enablement on keystone meeting</font><br>
<hr width="100%" size="2" align="left" noshade style="color:#8091A5; "><br>
<br>
<br>
<font size="2" face="sans-serif">Looks OK to me. I'll add it to the agenda for next week.</font><br>
<font size="2" face="sans-serif"><br>
Brant Knudson, OpenStack Development - Keystone core member<br>
Phone:   507-253-8621 T/L:553-8621<br>
</font><br>
<br>
<br>
<img width="16" height="16" src="cid:1__=C7BBF4F6DFA6ED228f9e8a93df938@cn.ibm.com" border="0" alt="Inactive hide details for Feng Xi BJ Yan---06/02/2015 11:58:22 PM---OK, please take a look at this patch https://review.opensta"><font size="2" color="#424282" face="sans-serif">Feng Xi BJ Yan---06/02/2015 11:58:22 PM---OK, please take a look at this patch <a href="https://review.openstack.org/#/c/187751/">https://review.openstack.org/#/c/187751/</a> Best Regard:)</font><br>
<br>
<font size="1" color="#5F5F5F" face="sans-serif">From:      </font><font size="1" face="sans-serif">Feng Xi BJ Yan/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">To:        </font><font size="1" face="sans-serif">Brant L Knudson/Rochester/IBM@IBMUS@IBMAU</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Cc:        </font><font size="1" face="sans-serif">Dan Moravec/Rochester/IBM@IBMUS, Zhu ZZ Zhu/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Date:      </font><font size="1" face="sans-serif">06/02/2015 11:58 PM</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Subject:   </font><font size="1" face="sans-serif">Re: Could you help to talk about DB2 CI enablement on keystone meeting</font><br>
<hr width="100%" size="2" align="left" noshade style="color:#8091A5; "><br>
<br>
<font size="2" face="sans-serif">OK, please take a look at this patch </font><a href="https://review.openstack.org/#/c/187751/"><font size="2" face="sans-serif">https://review.openstack.org/#/c/187751/</font></a><br>
<br>
<br>
<font size="2" face="sans-serif"><br>
<br>
Best Regard:)<br>
Bruce Yan<br>
<br>
Yan£¬ Fengxi £¨ãÆ·ïϲ£©<br>
Openstack Platform Team<br>
IBM China Systems & Technology Lab, Beijing<br>
E-Mail: yanfengxi@cn.ibm.com<br>
Tel: 86-10-82451418  Notes: Feng Xi FX Yan/China/IBM<br>
Address: 3BW239, Ring Building. No.28 Building, ZhongGuanCun Software Park,No.8  <br>
DongBeiWang West Road, ShangDi, Haidian District, Beijing, P.R.China</font><br>
<br>
<br>
<img width="16" height="16" src="cid:1__=C7BBF4F6DFA6ED228f9e8a93df938@cn.ibm.com" border="0" alt="Inactive hide details for Brant L Knudson---2015/06/02 21:50:42---You need to provide some evidence that this is working for ke"><font size="2" color="#424282" face="sans-serif">Brant L Knudson---2015/06/02 21:50:42---You need to provide some evidence that this is working for keystone before I'll bring it forward. Th</font><br>
<br>
<font size="1" color="#5F5F5F" face="sans-serif">From:      </font><font size="1" face="sans-serif">Brant L Knudson/Rochester/IBM@IBMUS</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">To:        </font><font size="1" face="sans-serif">Feng Xi BJ Yan/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Cc:        </font><font size="1" face="sans-serif">Dan Moravec/Rochester/IBM@IBMUS, Zhu ZZ Zhu/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Date:      </font><font size="1" face="sans-serif">2015/06/02 21:50</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Subject:   </font><font size="1" face="sans-serif">Re: Could you help to talk about DB2 CI enablement on keystone meeting</font><br>
<hr width="100%" size="2" align="left" noshade style="color:#8091A5; "><br>
<br>
<br>
<font size="2" face="sans-serif">You need to provide some evidence that this is working for keystone before I'll bring it forward. There should be logs for successful keystone runs.</font><br>
<font size="2" face="sans-serif"><br>
Brant Knudson, OpenStack Development - Keystone core member<br>
Phone:   507-253-8621 T/L:553-8621<br>
</font><br>
<br>
<br>
<img width="16" height="16" src="cid:1__=C7BBF4F6DFA6ED228f9e8a93df938@cn.ibm.com" border="0" alt="Inactive hide details for Feng Xi BJ Yan---06/02/2015 04:43:59 AM---Hi, Brant, Today is the time for keystone online meeting. B"><font size="2" color="#424282" face="sans-serif">Feng Xi BJ Yan---06/02/2015 04:43:59 AM---Hi, Brant, Today is the time for keystone online meeting. But it's too late for me(3 AM in my time z</font><br>
<br>
<font size="1" color="#5F5F5F" face="sans-serif">From:      </font><font size="1" face="sans-serif">Feng Xi BJ Yan/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">To:        </font><font size="1" face="sans-serif">Brant L Knudson/Rochester/IBM@IBMUS</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Cc:        </font><font size="1" face="sans-serif">Dan Moravec/Rochester/IBM@IBMUS, Zhu ZZ Zhu/China/IBM@IBMCN</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Date:      </font><font size="1" face="sans-serif">06/02/2015 04:43 AM</font><br>
<font size="1" color="#5F5F5F" face="sans-serif">Subject:   </font><font size="1" face="sans-serif">Could you help to talk about DB2 CI enablement on keystone meeting</font><br>
<hr width="100%" size="2" align="left" noshade style="color:#8091A5; "><br>
<br>
<font size="2" face="sans-serif">Hi, Brant,</font><br>
<font size="2" face="sans-serif">Today is the time for keystone online meeting. But it's too late for me(3 AM in my time zone). Could you help to talk abut the DB2 CI enablement for keystone? Appriciate it.</font><br>
<br>
<font size="2" face="sans-serif">The following issues are all fixed:</font><br>
<font size="2" face="sans-serif">1) merged failure is solved.</font><br>
<font size="2" face="sans-serif">2) Log rotaion time is now 60 days.</font><br>
<font size="2" face="sans-serif">3) Logs are browsable.</font><br>
<font size="2" face="sans-serif">An example of cinder: </font><a href="http://dal05.objectstorage.softlayer.net/v1/AUTH_58396f85-2c60-47b9-aaf8-e03bc24a1a6f/cilog/94/182994/6/check/ibm-db2-ci-cinder/66f2502/logs/"><font size="2" face="sans-serif">http://dal05.objectstorage.softlayer.net/v1/AUTH_58396f85-2c60-47b9-aaf8-e03bc24a1a6f/cilog/94/182994/6/check/ibm-db2-ci-cinder/66f2502/logs/</font></a><br>
<font size="2" face="sans-serif">4) Tempests are run by testr, not nosetests.</font><br>
<font size="2" face="sans-serif">5) Mainterner keeps an eye on and handle the test results in time.<br>
<br>
Best Regard:)<br>
Bruce Yan<br>
<br>
Yan£¬ Fengxi £¨ãÆ·ïϲ£©<br>
Openstack Platform Team<br>
IBM China Systems & Technology Lab, Beijing<br>
E-Mail: yanfengxi@cn.ibm.com<br>
Tel: 86-10-82451418  Notes: Feng Xi FX Yan/China/IBM<br>
Address: 3BW239, Ring Building. No.28 Building, ZhongGuanCun Software Park,No.8  <br>
DongBeiWang West Road, ShangDi, Haidian District, Beijing, P.R.China</font><br>
<br>
<br>
<br>
</body></html>