[openstack-dev] [TripleO][infra] HW upgrade for tripleo CI

Ben Nemec openstack at nemebean.com
Fri May 6 14:57:19 UTC 2016


\o/

On 05/06/2016 09:36 AM, Derek Higgins wrote:
> Hi All,
>    the long awaited RAM and SSD's have arrived for the tripleo rack,
> I'd like to schedule a time next week to do the install which will
> involve and outage window. We could attempt to do it node by node but
> the controller needs to come down at some stage anyways and doing
> other nodes groups at a time will take all day as we would have to
> wait for jobs to finish on each one as we go along.
> 
>    I'm suggesting we do it on one of Monday(maybe a little soon at
> this stage), Wednesday or Friday (mainly because those best suit me),
> has anybody any suggestions why one day would be better over the
> others?

I would probably suggest Monday or Friday, since it usually seems like
CI is the quietest at the ends of the week.

> 
>    The other option is that we do nothing until the Rack is moved
> later in the summer but the exact timing of this is now up in the air
> a little so I think its best we just bite the bullet and do this ASAP
> without waiting.

Yeah, that's still a couple of months off, and it seems silly to have
all that hardware sitting around unused for so long.




More information about the OpenStack-dev mailing list