[openstack-dev] [designate] Update on Meetings + Code Freeze post Summit

Hayes, Graham graham.hayes at hpe.com
Mon Oct 19 18:22:46 UTC 2015


-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Hi All,

Just a reminder that at the last IRC meeting [0] we decided a few things

1 - We are skipping 2 weeks or IRC meetings

2 - Due to the "big rename" [1] we are implementing a code freeze from
    the 10th -> 13th of November.

The core team should be online on Monday the 9th to push as many
patches through as possible. All patches proposed after the 10th that
are not in the correct topic will be getting a procedural -2.

This will be lifted on the 13th, but nearly all patches will need
manual rebasing post rename.

I realise that this may cause some issues, but this is a rename we
really need do. We have had a host of "interesting" code to work around
it, and I think now that the v1 API is actually depricated, we can
start.

0 -
http://eavesdrop.openstack.org/meetings/designate/2015/designate.2015-10
- -14-17.00.html

1 - https://blueprints.launchpad.net/designate/+spec/the-big-rename

If there is any questions, give me a shout.

Graham

- -- 
Graham Hayes
Software Engineer
DNS as a Service

GPG Key: 7D28E972


graham.hayes at hpe.com
Dublin,
Ireland

HP

-----BEGIN PGP SIGNATURE-----
Version: GnuPG v2.0.22 (GNU/Linux)

iQEcBAEBAgAGBQJWJTTzAAoJEPRBUqpJBgIiZcwH/1QrKy9y8L3sVKvzwPyNzd1Z
y6soZKt8F6vd2AAj5eQ21x5ihH/oRr9J96Y0Ssm6jakNv5eoAp9UPQn/5OrzD+mW
HabskjEHnCFvMvTx8cd3CSc8UJJBpi96MhxXWzfjZ8FJTq+e84w6YaeAvZX+kVKv
8gj9iCxbvWGIteLGu9qJaiLfQvKjGwAtYCLwh+Nte9Clovnt3azTR5GUnMFxx7xv
tWIl82hSVLQQZpfTFxy6k+04EtXEhF5lafe/njmOTQ+Ee7toXnzLJNGt64N8538C
QSNQ0KsO2DG2PYXF33H9AIVsVPwh1fU7Nh1eof5jr5yBDoY5lg1DDzi3o8XW26c=
=uiqF
-----END PGP SIGNATURE-----



More information about the OpenStack-dev mailing list